Water Pump Suppliers in UAE | Booster Pump Suppliers in UAE | Lowara Pump UAE | Ariston Solar Water Heater Supplier in UAE | Submersible Pump Suppliers in UAE
  • Home
  • About Us
  • Products
    • Pumps >
      • Booster Pumps
      • Horizontal Multistage Pumps
      • Lowara Pumps
      • End Suction Pumps
      • Submersible Pumps >
        • Submersible Sewage Pumps
        • Submersible Drainage Pumps
        • Stainless Steel Sewage Pumps
      • Vertical Multistage Pump
      • Ebara Pumps
      • Xylem Goulds Pump
    • Solar Water Heater >
      • Ariston Solar Water Heater
      • Ariston Kairos Thermo CF
    • Water Storage Tanks
    • Pressure Vessel >
      • Wates Pressure Vessel
      • Aquasystem Pressure Tank
      • CIMM Pressure Vessel
  • Contact
  • Home
  • About Us
  • Products
    • Pumps >
      • Booster Pumps
      • Horizontal Multistage Pumps
      • Lowara Pumps
      • End Suction Pumps
      • Submersible Pumps >
        • Submersible Sewage Pumps
        • Submersible Drainage Pumps
        • Stainless Steel Sewage Pumps
      • Vertical Multistage Pump
      • Ebara Pumps
      • Xylem Goulds Pump
    • Solar Water Heater >
      • Ariston Solar Water Heater
      • Ariston Kairos Thermo CF
    • Water Storage Tanks
    • Pressure Vessel >
      • Wates Pressure Vessel
      • Aquasystem Pressure Tank
      • CIMM Pressure Vessel
  • Contact

Wates Pressure Vessel Blog

Step-by-Step Guide to Installing a Wates Pressure Vessel for Domestic Water Systems

11/3/2025

0 Comments

 
Wates Pressure Vessel Supplier in UAE
1. Pressure Vessels
  • Why pressure vessels are required in domestic booster pump systems
  • Role of a Wates pressure vessel in stabilizing pressure, reducing pump cycling, and protecting the system
  • Brief note: This guide focuses on typical installations in villas, residential buildings, and small commercial setups


2. Tools and Materials Required
  • Adjustable wrench set
  • PTFE/Teflon tape
  • Pressure gauge (0–10 bar or based on system rating)
  • Isolation valve (ball valve)
  • Pump manifold or tee fitting
  • Pipe fittings and unions (GI, brass, or SS depending on system)
  • Mounting brackets or floor stand (if required)
  • Air pressure pump or compressor for pre-charge adjustment
  • Thread sealant or pipe dope


3. Pre-Installation Checks
  1. Verify the vessel size and pressure rating match the pump system design
  2. Confirm model type: vertical or horizontal mounting
  3. Check vessel for physical damage, dent, or coating defects
  4. Confirm factory pre-charge pressure written on label
  5. Ensure location meets installation conditions:
    • Protected from direct sunlight and weather
    • Adequate floor space or wall support
    • Accessible for maintenance and pressure checks


4. Step-by-Step Installation Procedure
Step 1: Position the Vessel
  • Place the vessel in a vertical or horizontal position based on model
  • Ensure vessel is level and properly supported
  • Leave minimum 200–300 mm clearance for servicing the air valve and fittings
Step 2: Install an Isolation Valve
  • Fit a ball valve between vessel and pipeline to allow future maintenance
  • This allows vessel removal without draining entire system
Step 3: Connect the Vessel to the Pump Discharge Line
  • Use a tee connection right after the pump outlet or on the manifold
  • Ensure water inlet is connected to bottom port (for bladder tanks)
  • Use proper sealing tape to prevent thread leaks
Step 4: Fit a Pressure Gauge
  • Install a gauge near the vessel or on the discharge manifold
  • This allows monitoring of system pressure and vessel performance
Step 5: Check and Adjust Air Pre-Charge Pressure
  • Before filling with water, measure vessel pre-charge using air valve (Schrader)
  • Adjust using a hand pump or compressor
  • Pre-charge should be 0.2–0.5 bar lower than pump cut-in pressure
    Example: If pump starts at 2.5 bar, set vessel at 2.0–2.3 bar
Step 6: Start the Pump and Fill the Vessel
  • Open isolation valve, turn on pump power
  • Allow pump to run until system reaches cut-off pressure
  • Check for leaks at all fittings and joints
Step 7: Test Cycle and Drawdown
  • Open a faucet to release pressure and watch if pump restarts as per settings
  • Confirm that water flows from the vessel before pump activation (stored drawdown volume)


5. Post-Installation Checklist
  • Air pressure label updated after commissioning
  • Isolation valve operable and accessible
  • Vessel installed in a protected and ventilated location
  • No pipe stress or strain on vessel connection
  • No air or water leaks after pressure test
  • Pressure switch settings confirmed (cut-in and cut-off)


6. Common Installation Mistakes to Avoid
  • Not checking or adjusting pre-charge pressure
  • Installing vessel in direct sunlight or high-heat area
  • Overtightening fittings and damaging tank threads
  • Mounting vessel without isolation valve
  • Connecting vessel to suction side of the pump instead of discharge side
  • Leaving vessel unsupported, causing stress fractures at connection point


7. Ongoing Maintenance After Installation
  • Check pre-charge pressure every 6–12 months
  • Inspect tank exterior for rust, coating damage, or condensation
  • Monitor pump cycling frequency – fast on/off cycles indicate vessel problems
  • Replace bladder if vessel becomes waterlogged


8. Applications for This Installation Method
  • Villa booster pump systems
  • Domestic well pump systems
  • Residential RO or water filtration systems
  • Small commercial buildings and cafés
  • Irrigation and garden water supply
A correctly installed Wates pressure vessel ensures stable water pressure, longer pump life, and reduced energy consumption. Proper sizing, correct pre-charge, and correct plumbing layout are key to long-term performance. ​For more info contact Wates Pressure Vessel Supplier in UAE or call us at +971 4 2522966.

0 Comments



Leave a Reply.

    Author

    Write something about yourself. No need to be fancy, just an overview.

    Archives

    November 2025
    August 2025
    July 2025
    April 2025

    Categories

    All

    RSS Feed

Services

Water Pumps
Solar Water Heater
Water Tanks
​Pressure Vessel

Quick links

About us
Products
Careers
​Contact us

Contact us

Dxb Solutions LLC
Al Qusais Industrial Area 1
Dubai, UAE
Tel: +971 4 252 2966
Fax: +971 4 297 7388
​Mob: +971 56 329 5097
mail: [email protected]
© COPYRIGHT 2015. ALL RIGHTS RESERVED.