1. Introduction
2. Tools and Materials Required
3. Pre-Installation Checks
4. Step-by-Step Installation Procedure Step 1: Position the Vessel
5. Suggested Booster Pump Piping Layout (Text Description) Pump → Check Valve → Discharge Manifold → Tee → Isolation Valve → Vessel Additional ports: pressure gauge, pressure switch, PRV, drain valve (Can be turned into a diagram if needed) 6. Post-Installation Checklist
7. Common Installation Mistakes to Avoid
8. Maintenance After Installation
9. UAE/GCC Installation Notes